Processplus Latest News
All the latest from our Dunfermline HQCase Studies / Projects
- With performance critical analysis of Dissolved Organic Carbon required at Invercannie WTW, Scottish Water Operations engaged Processplus to design, install, commission, and test, real time water quality measurement systems within the Membrane Plant.
- A remote location with a project completed ahead of time and on budget
- Working within the Aggregate Industry
- A varied portable monitoring system designed to measure different compounds.
- With the need to maintain water quality performance at Glenfarg WTW, Processplus delivered a full upgrade to the turbidity instrumentation throughout the site for Scottish Water Operations.
- Successful Instrument upgrade on waste water treatment works.